Home › Production planning
Production planning

From the daily order sheet to the materials you need.

Take a photo of the day’s order sheet. AsphaltPlant.ai reads the orders, matches each one to a saved mix design for your plant, and works out the tons of each aggregate, RAP and virgin asphalt binder you need to make it.

How it works

  • Photograph or upload the daily order sheet, or type the orders in.
  • Review what was read: customer, mix and tons for each order, before anything is calculated.
  • Match to your mix designs: each order is matched to a saved mix design at the selected plant. Mix numbers are never borrowed from another plant.
  • Get the totals: tons of each aggregate, RAP and RAS, and virgin asphalt binder after the recycled binder credit, for every order and for the day.

AI reads. Math calculates.

AI helps read handwritten and printed order sheets. The material numbers themselves come from defined calculation rules, so the same order and the same mix design always give the same answer. A language model never estimates your tonnage.

Checks before you trust a number

  • Orders with no matching mix design are flagged, not guessed.
  • When more than one saved design could fit, you choose.
  • Unreadable, missing or negative tonnage is held for you to confirm.
  • Mix designs whose material percentages do not add up are called out before they are used.

Who uses it

Plant operators planning the day, loader operators who need the material totals, and managers ordering aggregate, RAP and liquid asphalt. It runs in a phone or desktop browser.

See it with your own plant’s paperwork.

Start with one mix design and today’s order sheet. Built by an asphalt plant operator with over 20 years of plant experience.

Create an accountAsk about a pilot